Zvezdara, Mirijevo I - Ladne vode 41m2

Beograd, Mirijevo I, Ladne vode

Information

Ad ID: A1-5640

Flat

Surface: 41 m2

Number of rooms: 2

Floor: 2

Number of floors: 4

Terrace: Yes

Year of construction: 2010

Heating: Central

Number of bathrooms: 1

Description

2. 0, 41m2 (terrace), 2/4, electric heating, air conditioning, intercom, internet, cable TV, no investment needed

The apartment is located in the middle part of the quiet street Ladne vode, which is situated at the beginning of Mirijevo from the direction of Karaburma, between Mirijevski bulevar and Jovanke Radaković Street.

We are pleased to offer you a nice two-room apartment on the second floor of a four-story building without an elevator, built in 2010. The building is in excellent condition both inside and out, with a completed facade. The rooms in the apartment are spacious and each has a window. The layout is extremely functional, so the available space is used to the maximum. The living area is in an open-space style with a slightly separated kitchen-dining area. If needed, the kitchen can be completely separated. The living room opens onto a beautiful, spacious terrace, made for enjoyment. It is corner-oriented, with dual orientation and plenty of daylight. The apartment has PVC joinery, oak parquet, a security entrance door, three-phase electricity, etc. It has been very well maintained, so no investment is necessary. Heating is individual electric heating and inverter air conditioning.

Rooms: living room, kitchen-dining area, terrace, bedroom, and bathroom.

The apartment is registered at 41 m2.

Selling agent: Isak Marčetić 064/167 53 81

Features

Internet

Cable

Registered

Air conditioner

Intercom

Map

Click to activate

Contact Info

Galerija nekretnine

011/ 405-8318

011/323-6409

065/233-5260

galerija logo
Or contact us via form: